Computing and Information Systems – 业务流程管理代写 -Canvas代写
Computing and Information Systems

Computing and Information Systems – 业务流程管理代写 -Canvas代写

School of Computing and Information Systems

Business Process Management

 

 

Computing and Information Systems THIS IS A SAMPLE EXAM, AS SUCH, ITS TOTAL POINTS DO NOT ADD UP TO 50. THE FINAL EXAM WILL HAVE 6 QUESIONTS (±1),···

 

THIS IS A SAMPLE EXAM, AS SUCH, ITS TOTAL POINTS DO NOT ADD UP TO 50. THE FINAL EXAM WILL HAVE 6 QUESIONTS (±1), FOR A TOTAL OF 50 POINTS. THE INSTRUCTIONS ON THIS SAMPLE EXAM WILL BE EXACTLY THE SAME OF YOUR FINAL EXAM, FAMILIARISE WITH THEM SO YOU WON’T LOSE TIME READING THEM DURING THE ACTUAL EXAM.

Final Exam – Semester 1, 2021 , Reading Time: 15 minutes , Writing time: 120 minutes ,This paper has 2 pages including this cover page

INSTRUCTIONS  Computing and Information Systems 

  • This exam is open-books, you are allowed to consult any material or website during the exam.
  • This exam is an individual exam, you may not cooperate with other students.
  • This exam is worth 50% of the overall subject mark (i.e., 50 points).
  • Hurdle requirement. To pass this subject (ISYS90081) you must score at least 25 points in this exam.
  • This exam consists of X questions, each worth between Y and Z points, for a total of 50 points.
  • The points of each question are reported in brackets at the end of each question.
  • Each question relates to a scenario.
  • Some questions are standalone, they contain both a short scenario-description and the question itself.

THIS SAMPLE EXAM ONLY CONTAINS STANDALONE QUESITONS.

  • Some questions follow a lengthy description (1-2 pages) of a unique scenario, and they relate all to such a scenario. In this case, these questions would be provided as “sub-questions” of a unique scenario.

AN EXAMPLE OF SUCH QUESTIONS IS PROVIDED IN TUTORIAL 10 EXERCISE 2. Computing and Information Systems

  • Carefully read each question and follow the guidelines in ITALIC when answering it.
  • There is no mandatory answer format. Your answers may be structured as bullet points OR as discursive paragraphs OR a mix of the two. Answers have no word-limit.
  • When answering a question, you may need to make some assumptions. Assumptions may influence your score. Do not make assumptions that contradict any provided information. Do not makeassumptions that are unlikely to be realistic. Do not make assumptions if they are not required.
  • Your answers must be original, any answer that is partially or fully copied from any source (e.g., lectureslides, tutorial solutions, book, websites, videos, etc.) will attract 0 points.
  • Answer all the questions on a single Word file. At the top of the Word file write: your name and student  ID; the exam date; this subject name and its code (ISYS90081). You may use the template available on Canvas, the file named “ISYS90081-2020S2-solution-template.docx” in the Assessment module.
  • Your file should be named as “ISYS90081–Exam–YOUR-STUDENT-ID.pdf”
  • Before the end of the examination time, save your Word file as a PDF file and submit it on Canvas, as you did for Assignment 1 and Assignment 2.School of Computing and Information Systems  Business Process Management ISYS90081 Copyright 2020, The University of Melbourne Page 2 of 2
  • Shall you experience technical issues when submitting your file, immediately send the file via email to [email protected] along with proof of your technical issue (e.g., screenshot showing date and time). For technical issues (with proof), you are automatically granted an additional 5-minute time window to complete your submission either via Canvas or via email.
Computing and Information Systems
Computing and Information Systems

QUESTIONS  Computing and Information Systems

  1. A large bank hired you to review and update their process architecture. The project will focus only and exclusively on the process identification phase of the BPM lifecycle. Describe in detail what you would do from day-1 of the project till the delivery of the process architecture artifact. (8 points)
  1. A large manufacturer hired you as a process analyst. In a BPM project, after producing the as-is process model of a core process, you performed some initial quantitative  analysis and found that the cycle time efficiency of the process was very low. Describe  in detail what you would do to identify the causes of the low cycle time efficiency. Clearly  mention what BPM methods or technology you would use. (7 points) Computing and Information Systems
  1. You were hired by a large company to discover, analyse, and improve one of their core processes. The company has information systems that collect process execution data in the form of event logs and monitor in real-time the process executions. The company also has process documentation, and the process owner told you that you can set up workshops with process participants to discuss how the process is executed. What would you do to produce the required process model(s)? Your answer should focus only  on process discovery, however, you should consider that you are discovering the process  model(s) to then perform analysis and improvement. (9 points) End of Exam Paper

 

更多其他:代写作业 数学代写 物理代写 生物学代写 程序编程代写  墨尔本essay代写

合作平台:天才代写 幽灵代  写手招聘  paper代写

发表回复